<nav id="7jtmj"><tt id="7jtmj"></tt></nav>
    <sub id="7jtmj"></sub>
  • 亚洲性爱综合网_少妇人妻一级黄色片无码_久久亚洲AⅤ无码_中国成人A级黄色毛片

    Contact Us

    Cross Flow Fan test and inspection

    Date: 2016-6-4   Click: 1975 Times

    "Cross Flow Fan" when the test is not less than two persons, one power control, a person was observed cooling fan is running, abnormal phenomenon immediately stop inspection; First check the direction of rotation is correct; after centrifugal fan starts running, you should immediately check the phase operating current is balanced, if the current exceeds the rated current; if not normal, you should stop to check. After running five minutes, stop to check whether the cooling fan anomalies, confirming that no anomalies and then start running. When two-speed centrifugal cooling fan test, you should start low, check the direction of rotation is correct; must be stationary when starting the fan speed and then start to prevent high-speed reverse rotation, causing damage to the motor and switch tripping.

    Back to: Industry news

    +86-0769-83660708

    Home Product News Contact

    亚洲性爱综合网_少妇人妻一级黄色片无码_久久亚洲AⅤ无码_中国成人A级黄色毛片
    <nav id="7jtmj"><tt id="7jtmj"></tt></nav>
    <sub id="7jtmj"></sub>